Login:   Password:
Not Register?    Sign Up NOW!
Date: 01 December 2008
Google
 
Cameron Highway Oil Pipeline System Project  
Search Country   Reset filter

Cameron Highway Oil Pipeline System Project

Product Name: Cameron Highway Oil Pipeline System Project

Product Description

Cameron Highway Oil Pipeline System Project
client                 Manta Ray Gathering Company LLC (El Paso)
project             Cameron Highway Oil Pipeline System Project
location             Gulf of Mexico
installation         2004
vessels              Solitaire, Trenchsetter & Calamity Jane

scope of work
engineering
pipelay
trenching

project specials
longest pipeline installed in Gulf of Mexico
pipeline installed in flooded condition in order to provide sufficient bottom stability
shallow water section trenched to 3 feet cover (fig. 2)
Cameron Highway Oil Pipeline System Project

Related Products: Turn Key Fabrication, "HIGH PERFORMANCE GAS DRIVE" K-18, "HIGH PERFORMANCE GAS DRIVE" K-18 G, "HIGH PERFORMANCE GAS DRIVE" K-30G, "HIGH PERFORMANCE GAS DRIVE" K-50 G, "HIGH PERFORMANCE GAS DRIVE" K-70, (PoE) Power over Ethernet Switches, -8322 and B-8323 Series, 1 GPM Electrocoagulation System, 1,000 ft rated Plastic Floats, 1-amp battery charge controller supports universal Li-ion designs, 1-watt DC/DCs extend reliability, 1/2" Reducing Shaft, 1/3 & 3/4 HP Fixed Speed, Variable Length Turbines, 100% Tested!, 105 Series AdaptaBeacon Adverse Location Signal, 108FC (Globe) / 108FCA (Angle), 108FPS PUMP SUCTION CONTROL VALVE, 11) KNIGHT AIR ROLL HANDLING SYSTEM, 120 mm Mortar Ammunition Family, 120 mm Mortar Weapon System, 19'' Rackmount Cases, 1900MS12-24 LED Wall Clock, 1998 Pandjiris Hot Wire Tig Pipe Welding System - WS509001, 2 HP Fixed Speed, Variable Length Turbines
Home | Members.Benefit | Privacy.Policy | Bookmark.This.Page | Contact.Us
© 2006 - 2007 4engr. All Rights reserved |Recommended Engineering Sites:| Center for Respect of Life and Environment | Internet Dictionary|Enginering intent(Engineering Events) | Map Archive